Deployment Scenario Sample A

Model A
In this scenario by using the existing copper cable going to
the fields the CBS can be installed at remote locations. Each Base
Station requires 3 Pair to be extended. So, depending upon the required
number of Base Station can be installed in the area to get the proper
coverage. The CBS can be extended up to a copper length of 4 Km.
Typically. The DIU will be installed in the Exchange premises and some
CBS can be installed co-located on the tower to provide the local
coverage.

|